Bigfoot Civil has been awarded the contract to deliver Stages 2 and 3 of the Nichols Point Drainage Upgrade, a key part of the wider stormwater management strategy for the growing Nichols Point area. These stages focus on improving the local drainage network through new stormwater pipelines, swales and upgraded connections that integrate with the broader system of drainage basins identified in the Nichols Point Development Plan. Once complete, the upgrades will increase capacity, improve stormwater flow, and support future residential growth while reducing local flooding issues across the catchment.