Bigfoot Civil has been engaged to clear and grade 200 acres of scrub back to clean farming soil, including rubbish removal and site tidy-up around the house and shed. The project also includes the design and construction of a 50-megalitre dam, supported by required approvals, vegetation assessment, surveying, geotechnical testing, and full irrigation basin design.