Karisma Subdivision

The Karisma Subdivision project involves the delivery of comprehensive civil infrastructure works to transform the site into a fully serviced, construction-ready residential development. The scope includes bulk earthworks and site preparation, road pavement construction and asphalt surfacing, concrete kerbing and footpaths, stormwater drainage, service trenching, and associated traffic management works. The project also includes the […]
Infinity Farms Car park

Infinity Farms engaged us to deliver civil works associated with the development of their site, including earthworks and subgrade preparation, road base construction and recycled asphalt surfacing. The works also included box culvert installation to provide drainage to the basin, kerbing to the car parking area, survey set-out and overall site management.
MCA Carpark

Bigfoot Civil successfully completed extensive car park construction and pavement sealing works for MCA, delivering a high-quality surface solution designed to improve site access, durability, and long-term performance. The project included bulk earthworks, subbase preparation and compaction, installation of multiple 150mm pavement layers, surface preparation works, drainage improvements, and final two-coat sealing works with Fulton […]
Nichols Point Drainage Upgrade Stage 2 & 3

Bigfoot Civil has been awarded the contract to deliver Stages 2 and 3 of the Nichols Point Drainage Upgrade, a key part of the wider stormwater management strategy for the growing Nichols Point area. These stages focus on improving the local drainage network through new stormwater pipelines, swales and upgraded connections that integrate with the […]
Cowra Station

Bigfoot Civil has been engaged to clear and grade 200 acres of scrub back to clean farming soil, including rubbish removal and site tidy-up around the house and shed. The project also includes the design and construction of a 50-megalitre dam, supported by required approvals, vegetation assessment, surveying, geotechnical testing, and full irrigation basin design.
Highpoint

The proposed subdivision at 353 Irymple Avenue delivers a low-density residential development supported by new internal road construction, kerb and footpath works, and fully integrated services. The design includes 17 residential allotments a complete stormwater drainage network with new pipelines, pits, and a purpose-built drainage basin to manage onsite runoff in accordance with MRCC requirements. Upgrade […]
Corbett Ave Industrial Development

This project involves the delivery of essential civil infrastructure works to support industrial development on Corbett Avenue. The scope includes the installation of sewer and water services, along with the construction of internal road infrastructure, ensuring compliant, safe, and reliable servicing for future industrial use. Works are designed and delivered in accordance with relevant authority […]
Alinga Grove Estate, Gol Gol

Successfully completed stages 2, 3, and 4 of the Morrison Development project transforming a greenfield site into a premier subdivision in Gol Gol. Final stages have been complete and promise to solidify Morrison Development’s position as a premier subdivision in the region.
LMW Culvert Drainage Upgrade – Meridian Road Merbein

The aim of the project is to upgrade the existing drainage culvert to enhance its durability and capacity while minimizing environmental impacts. The culvert serves a crucial function in managing water flow and preventing flooding, particularly in areas used for heavy transport.
Mildura South Kindergarten

Initially engaged for civil construction work in the car park, our role expanded significantly due to the diverse skill levels of our team. We undertook carpentry and concrete works, and we also supplied builders and skilled laborers throughout the project. This collaboration has culminated in the development of a new local kindergarten space, aimed at […]